Thursday, March 1, 2012

1 mac 2012 9M-MMV

1.install pulley at st158
2.rig cable
3.prepare removal nose gear
4.transfer old card to new card with  LAE christy

Tuesday, February 28, 2012

28 feb 2012

hari carry out inspection of part no and various of serial no of components...
previous day...nothing,tunggu card 27/02/2012
tomorrow,jamuan

Thursday, February 23, 2012

22 and 23 FEB 2012

CABLE INSPECTION ON ZONE 200 FWD
DEFECT:CABLE CHAFING ESB FOR ENGINE STARTER

Tuesday, February 21, 2012

21/02/2012 9M-MMV

1.CARRY OUT REMOVAL CENTRE TANK PANEL
-OPEN SEVERAL BOLTS TO RELEASE EXCESSIVE FUEL
-DEFUEL THE FUEL
-REMOVE THE SEALANT
-REMOVE THE PANEL
-PURGE THE CANTRE TANK

2.CARRY OUT REMOVAL AND INSTALLATION OF HYDRAULIC FUSE AT THE AIRCOND BAY BOTH LH AND RH
PN:2802024 ALT PN :277341
DESCRIPTION:FUSE ASSY-HYD LUMBING INSTALLATION

3.REPLACE THE GROUND SERVICE DISCONNECT FILTER (REMOVAL&INSTALLATION)

MAS COMPANY PROCEDURES WEEK


EMMMMM,BEST JUGEK KELAS NI.BLEH JUMPA KAWAN2 YG TERPISAH

20/02/2012

HARI NI DENGAN JAYANYA,TAMATLAH KELAS COMPANY...
EXAM TADI MACAM OK JE...INSYAALLAH LULUS

ENGINE RUN 9M-MMV 13/02/2012

ENGINE RUN 9M-MMV 13/02/2012

1.POWER ON
2.BOOSTER PUMP AFT TANK NO 1 ON
3.ANTI-CO LOGHT ON
4.EMDP OFF
5.PULL ALL THE CB
-VOICE RECORDER
-WHEATER RADAR

1.ON VHF MIC SELECTOR-CONTACT CONTROL TOWER
2.ON APU BLEED,L PACK
3.PERFORM CHECKLIST PRE-RUN ENGINE
4.EFIS BITE TEST
PED DISPLAY N2 106.0 EGT 930 N1 105.0 FF 50.0
SED OIL PRESS MIN,OIL TEMP MAX,50 50,50

1.SET ALTIMETER 0.040 71-00-00
2.REFER MPA (MAXIMUM POWER ASSURANCE) 71-00-00
FOR ENGINE MAX RATING TO MONITOR

ENGINE START
1.OFF ALL PACK VALVE
2.ON ALL BOOSTER PUMP
3.APU BLEED ON
4.SELECT START VALVE TO GROUND
5.SEE N2 UNTIL 25,,CUTOFF-----IDLE
6.START NO 1 ENGINE..
7.AFTER THAT,START NO 2 ENGINE

AT MPA,SEE FOR 28 DEG AMBIENT

ENGINE IDLE
PED                                                      SED
ENGINE 1       ENGINE 2                    28    OIL PRESS    28
20.8                 21.5                               80    OIL TEMP     80
634                  584                                0.5       VIB            0.5
62.6                 61.7
0.38                 0.36

ENGINE FULL POWER TEST (TARGET 86.8 N2)

PED
ENGINE 1      ENGINE 2
86.8
780
96.5

RUN SUCCESS (4 MINUTES)..SECOND ROUND (1 MINUTE)

PERFORM BLEED CHECK

1.APU BLEED OFF
2.BOTH PACK-ON
2.MONITOR THE GAUGE LEFT N RIGHT L 41,R 51

3RD WEEK OF JANUARY

16/1/2012 MONDAY 9M-MQG HILMI
1.CHANGE WIPER MOTOR R/H CO-PILOT