Tuesday, February 21, 2012

21/02/2012 9M-MMV

1.CARRY OUT REMOVAL CENTRE TANK PANEL
-OPEN SEVERAL BOLTS TO RELEASE EXCESSIVE FUEL
-DEFUEL THE FUEL
-REMOVE THE SEALANT
-REMOVE THE PANEL
-PURGE THE CANTRE TANK

2.CARRY OUT REMOVAL AND INSTALLATION OF HYDRAULIC FUSE AT THE AIRCOND BAY BOTH LH AND RH
PN:2802024 ALT PN :277341
DESCRIPTION:FUSE ASSY-HYD LUMBING INSTALLATION

3.REPLACE THE GROUND SERVICE DISCONNECT FILTER (REMOVAL&INSTALLATION)

No comments:

Post a Comment