1.install pulley at st158
2.rig cable
3.prepare removal nose gear
4.transfer old card to new card with LAE christy
Thursday, March 1, 2012
Tuesday, February 28, 2012
28 feb 2012
hari carry out inspection of part no and various of serial no of components...
previous day...nothing,tunggu card 27/02/2012
tomorrow,jamuan
previous day...nothing,tunggu card 27/02/2012
tomorrow,jamuan
Thursday, February 23, 2012
Tuesday, February 21, 2012
21/02/2012 9M-MMV
1.CARRY OUT REMOVAL CENTRE TANK PANEL
-OPEN SEVERAL BOLTS TO RELEASE EXCESSIVE FUEL
-DEFUEL THE FUEL
-REMOVE THE SEALANT
-REMOVE THE PANEL
-PURGE THE CANTRE TANK
2.CARRY OUT REMOVAL AND INSTALLATION OF HYDRAULIC FUSE AT THE AIRCOND BAY BOTH LH AND RH
PN:2802024 ALT PN :277341
DESCRIPTION:FUSE ASSY-HYD LUMBING INSTALLATION
3.REPLACE THE GROUND SERVICE DISCONNECT FILTER (REMOVAL&INSTALLATION)
-OPEN SEVERAL BOLTS TO RELEASE EXCESSIVE FUEL
-DEFUEL THE FUEL
-REMOVE THE SEALANT
-REMOVE THE PANEL
-PURGE THE CANTRE TANK
2.CARRY OUT REMOVAL AND INSTALLATION OF HYDRAULIC FUSE AT THE AIRCOND BAY BOTH LH AND RH
PN:2802024 ALT PN :277341
DESCRIPTION:FUSE ASSY-HYD LUMBING INSTALLATION
3.REPLACE THE GROUND SERVICE DISCONNECT FILTER (REMOVAL&INSTALLATION)
MAS COMPANY PROCEDURES WEEK
EMMMMM,BEST JUGEK KELAS NI.BLEH JUMPA KAWAN2 YG TERPISAH
20/02/2012
HARI NI DENGAN JAYANYA,TAMATLAH KELAS COMPANY...
EXAM TADI MACAM OK JE...INSYAALLAH LULUS
EXAM TADI MACAM OK JE...INSYAALLAH LULUS
ENGINE RUN 9M-MMV 13/02/2012
ENGINE RUN 9M-MMV 13/02/2012
1.POWER ON
2.BOOSTER PUMP AFT TANK NO 1 ON
3.ANTI-CO LOGHT ON
4.EMDP OFF
5.PULL ALL THE CB
-VOICE RECORDER
-WHEATER RADAR
1.ON VHF MIC SELECTOR-CONTACT CONTROL TOWER
2.ON APU BLEED,L PACK
3.PERFORM CHECKLIST PRE-RUN ENGINE
4.EFIS BITE TEST
PED DISPLAY N2 106.0 EGT 930 N1 105.0 FF 50.0
SED OIL PRESS MIN,OIL TEMP MAX,50 50,50
1.SET ALTIMETER 0.040 71-00-00
2.REFER MPA (MAXIMUM POWER ASSURANCE) 71-00-00
FOR ENGINE MAX RATING TO MONITOR
ENGINE START
1.OFF ALL PACK VALVE
2.ON ALL BOOSTER PUMP
3.APU BLEED ON
4.SELECT START VALVE TO GROUND
5.SEE N2 UNTIL 25,,CUTOFF-----IDLE
6.START NO 1 ENGINE..
7.AFTER THAT,START NO 2 ENGINE
AT MPA,SEE FOR 28 DEG AMBIENT
ENGINE IDLE
PED SED
ENGINE 1 ENGINE 2 28 OIL PRESS 28
20.8 21.5 80 OIL TEMP 80
634 584 0.5 VIB 0.5
62.6 61.7
0.38 0.36
ENGINE FULL POWER TEST (TARGET 86.8 N2)
PED
ENGINE 1 ENGINE 2
86.8
780
96.5
RUN SUCCESS (4 MINUTES)..SECOND ROUND (1 MINUTE)
PERFORM BLEED CHECK
1.APU BLEED OFF
2.BOTH PACK-ON
2.MONITOR THE GAUGE LEFT N RIGHT L 41,R 51
2.BOOSTER PUMP AFT TANK NO 1 ON
3.ANTI-CO LOGHT ON
4.EMDP OFF
5.PULL ALL THE CB
-VOICE RECORDER
-WHEATER RADAR
1.ON VHF MIC SELECTOR-CONTACT CONTROL TOWER
2.ON APU BLEED,L PACK
3.PERFORM CHECKLIST PRE-RUN ENGINE
4.EFIS BITE TEST
PED DISPLAY N2 106.0 EGT 930 N1 105.0 FF 50.0
SED OIL PRESS MIN,OIL TEMP MAX,50 50,50
1.SET ALTIMETER 0.040 71-00-00
2.REFER MPA (MAXIMUM POWER ASSURANCE) 71-00-00
FOR ENGINE MAX RATING TO MONITOR
ENGINE START
1.OFF ALL PACK VALVE
2.ON ALL BOOSTER PUMP
3.APU BLEED ON
4.SELECT START VALVE TO GROUND
5.SEE N2 UNTIL 25,,CUTOFF-----IDLE
6.START NO 1 ENGINE..
7.AFTER THAT,START NO 2 ENGINE
AT MPA,SEE FOR 28 DEG AMBIENT
ENGINE IDLE
PED SED
ENGINE 1 ENGINE 2 28 OIL PRESS 28
20.8 21.5 80 OIL TEMP 80
634 584 0.5 VIB 0.5
62.6 61.7
0.38 0.36
ENGINE FULL POWER TEST (TARGET 86.8 N2)
PED
ENGINE 1 ENGINE 2
86.8
780
96.5
RUN SUCCESS (4 MINUTES)..SECOND ROUND (1 MINUTE)
PERFORM BLEED CHECK
1.APU BLEED OFF
2.BOTH PACK-ON
2.MONITOR THE GAUGE LEFT N RIGHT L 41,R 51
2ND WEEK OF JANUARY
9/1/2012 MONDAY 9M-MQG
1.mcd inspection on engine no 1,no 2 9M-MQG found crack seal in no 1 of mcd on engine no 2
2.EDP installation on no 1 engine of 9M-MMR found satisfactory
3.assist in inspection on tailcone of engine no 1 MMR,found loose rivet,send to sheet metal
4.removal of flap track fairing for inspection
5.removal panel at pylon for fuse pin and fuse bolt inspection.
10/1/2012 TUESDAY 9M-MQG
1.removal of the cockpit door
PN:B221200BN621 REV G
S/N:583108
-remove the 2 smalls door first
-use no 2 bit
2.removal of the toilet bowl
-use philip,plain,cutter,multigrip,11/32,1 1/8
3.removal of engine no 1 blade for cleaning
-WPL-00018,SOURCE 2BC6-4-002A>>SYS-00142>SYS-00143
4.REMOVAL OF ENGINE NO 2 BLADE FOR CLEANING
-WPL-00021,SOURCE 2BC5-4-002B>SYS-00114>SYS00115
2205-CALL FOR D.O.B
11/01/2012 WEDNESDAY 9M-MQG LAE JAKUB
1.CHANGE THE SEAL (PERY SEAL)AT THE ADJUSTABLE NOZZLE FOR APU DISCHARGE AIR
P/N SEAL:490-400,460-400
SOURCE DOC:SYS-00051/68
DESCRIPTION:RING SEAL AND STANDARD SEAL + E SEAL BEFORE APU INSTALLATION
2.NO 1 ENGINE STARTER AND CSD SERVICING LAE YONG
3.REPLACE LINE FILTER AT INBOARD LH WING
P/N FILTER:7577741
SOURCE DOC:2BA3-3-001/85
P/N OF FILTER:7577741
12/1/2012 THURSDAY 9M-MQG LAE HILMI ASYRAN
1.CHECK WINDOW NO1/2 SEALANT FOR CONDITION AND REPAIR IF ANY OF THE FOLLOWING IS FOUND
-EROSION
-GAPS OR VOIDS
-DOES NOT OVERLAP THE GLASS
CARD NO:BA1-4-002
REF:AMM 56-11-11/601,56-11-00/801,56-12-11/601,56-12-11/801
1.mcd inspection on engine no 1,no 2 9M-MQG found crack seal in no 1 of mcd on engine no 2
2.EDP installation on no 1 engine of 9M-MMR found satisfactory
3.assist in inspection on tailcone of engine no 1 MMR,found loose rivet,send to sheet metal
4.removal of flap track fairing for inspection
5.removal panel at pylon for fuse pin and fuse bolt inspection.
10/1/2012 TUESDAY 9M-MQG
1.removal of the cockpit door
PN:B221200BN621 REV G
S/N:583108
-remove the 2 smalls door first
-use no 2 bit
2.removal of the toilet bowl
-use philip,plain,cutter,multigrip,11/32,1 1/8
3.removal of engine no 1 blade for cleaning
-WPL-00018,SOURCE 2BC6-4-002A>>SYS-00142>SYS-00143
4.REMOVAL OF ENGINE NO 2 BLADE FOR CLEANING
-WPL-00021,SOURCE 2BC5-4-002B>SYS-00114>SYS00115
2205-CALL FOR D.O.B
11/01/2012 WEDNESDAY 9M-MQG LAE JAKUB
1.CHANGE THE SEAL (PERY SEAL)AT THE ADJUSTABLE NOZZLE FOR APU DISCHARGE AIR
P/N SEAL:490-400,460-400
SOURCE DOC:SYS-00051/68
DESCRIPTION:RING SEAL AND STANDARD SEAL + E SEAL BEFORE APU INSTALLATION
2.NO 1 ENGINE STARTER AND CSD SERVICING LAE YONG
3.REPLACE LINE FILTER AT INBOARD LH WING
P/N FILTER:7577741
SOURCE DOC:2BA3-3-001/85
P/N OF FILTER:7577741
12/1/2012 THURSDAY 9M-MQG LAE HILMI ASYRAN
1.CHECK WINDOW NO1/2 SEALANT FOR CONDITION AND REPAIR IF ANY OF THE FOLLOWING IS FOUND
-EROSION
-GAPS OR VOIDS
-DOES NOT OVERLAP THE GLASS
CARD NO:BA1-4-002
REF:AMM 56-11-11/601,56-11-00/801,56-12-11/601,56-12-11/801
1ST WEEK ON JANUARY
23/12/2011----->2/1/2012 ON LEAVE
3/1/2012 TUESDAY 9M-MMR
1.VISUALLY CHECK THE L/H ENG OIL TANK FOR CONDITION AND SECURITY CHECK OF INSTALLATION
-CARD NO:2CC5-4-002
-REF :BMM 79-11-01/601 (MPD 79-11-01)
4/1/2012 WEDNESDAY 9M-MMR LAE JALIL
1.CHECK/INSPECT ASSEMBLY COOLING & HPT SYSTEM VALVE L/H ENGINE
-CARD NO:CC5-4-019
-REFERENCE:BMM 75-21-00(MPD (75-21-00-A1C)
2.VISUAL CHECK L/H ENGINE HPTCC AND COOLING MANIFOLD FOR CONDITION AND SECURITY CHECK OF INSTALLATION
-CARD NO:CC5-4-019
-REF:BMM 75-24-00(MPD(75-24-00-A1C)
3.VISUALLY CHECK THE L/H ENG MAIN OIL/HEAT EXCHANGER FOR CONDITION AND SECURITY CHECK OF INSTALLATION
-CARD NO:CC5-4-001
-REF:BMM 79-21-02/601 (MPD(79-21-02-6A 1C)
5/1/2012 THURSDAY 9M-MMR LAE AJIE
1.RH OUTBOARD FLAP BEARING INSTALLATION
2.RH OUTBOARD FLAP RIGGING
-NOT MORE THAN 24 THOU THE GAP
27-51-39
MQGMQGMQGMQGMQGMQGM JAN:191057000 VISIT NO:9111293
6/1/2012 FRIDAY 9M-MQG
1.PRE-DOCK
2.REMOVAL OF THE SCAFF PLATE AT DOOR FOR ACCESS FOR INSPECTION
3/1/2012 TUESDAY 9M-MMR
1.VISUALLY CHECK THE L/H ENG OIL TANK FOR CONDITION AND SECURITY CHECK OF INSTALLATION
-CARD NO:2CC5-4-002
-REF :BMM 79-11-01/601 (MPD 79-11-01)
4/1/2012 WEDNESDAY 9M-MMR LAE JALIL
1.CHECK/INSPECT ASSEMBLY COOLING & HPT SYSTEM VALVE L/H ENGINE
-CARD NO:CC5-4-019
-REFERENCE:BMM 75-21-00(MPD (75-21-00-A1C)
2.VISUAL CHECK L/H ENGINE HPTCC AND COOLING MANIFOLD FOR CONDITION AND SECURITY CHECK OF INSTALLATION
-CARD NO:CC5-4-019
-REF:BMM 75-24-00(MPD(75-24-00-A1C)
3.VISUALLY CHECK THE L/H ENG MAIN OIL/HEAT EXCHANGER FOR CONDITION AND SECURITY CHECK OF INSTALLATION
-CARD NO:CC5-4-001
-REF:BMM 79-21-02/601 (MPD(79-21-02-6A 1C)
5/1/2012 THURSDAY 9M-MMR LAE AJIE
1.RH OUTBOARD FLAP BEARING INSTALLATION
2.RH OUTBOARD FLAP RIGGING
-NOT MORE THAN 24 THOU THE GAP
27-51-39
MQGMQGMQGMQGMQGMQGM JAN:191057000 VISIT NO:9111293
6/1/2012 FRIDAY 9M-MQG
1.PRE-DOCK
2.REMOVAL OF THE SCAFF PLATE AT DOOR FOR ACCESS FOR INSPECTION